The herringbone flooring has been installed in the new PAC. This is a view from the sound mezzanine booth.
What's Happening?
The new PAC and band room are deep into the finishing stages as we approach the upcoming work this summer. Crews are installing paint and flooring installed across both areas.
In the PAC, flooring installation is wrapping up, with the herringbone floor pattern proudly displaying Rib Lake maroon and gold. Paint is being applied the walls and ceilings in the band room, as both spaces are beginning to show signs of completion.
Crews are also gearing up for the summer kitchen remodel once school lets out. Excitement is building as the plumber and electrician prepare to disconnect the existing equipment and get ready for the new equipment to arrive on site. Coordination for other high school finishes and restrooms is also ongoing, with the work set to begin in a couple of weeks.
|
The new sidewalks are formed and ready for the new concrete.
|
The acoustical panels on the PAC walls have been installed ahead of the new flooring.
|
Past Work
- Stage Ceiling Painting
- Band Room Masonry Walls
- Band Mezzanine Framing
- Addition Ramp Flooring
Upcoming Work
- Band Room Flooring
- Band Room Painting Ongoing
- PAC Flooring Ongoing
- PAC Projector Installation
 The flooring has been complete in the addition ramp. |
 The ceiling and wall paint have begun in the new band room. |
DID YOU KNOW?
The herringbone is a popular pattern with ceramic tile and flooring. The pattern is made of many distinct V-shaped, weaving rows of parallel lines that slant in opposite directions, mimicking the bones of a fish.
Questions?
Project Manager, Ryan Treichel / 414.323.0611 / rtreichel@findorff.com
Superintendent, Jeremy Rosenthal / 608.287.8083 / jrosenthal@findorff.com
Findorff BUILDING & BEYOND
Click Here to Open the May 15, 2026 Executive Summary pdf 