RIB LAKE SCHOOL DISTRICT
EXECUTIVE SUMMARY
PROVIDED BY FINDORFF
1200 North Street, Rib Lake, WI 09.05.2025

The overhead plumbing and fire protection installation has begun in the addition corridor.
What's Happening?
School is finally back in session! With staff and students returning to campus, work inside the building will slow down for the time being and work on the addition will continue. Recently completed areas such has the middle school locker rooms, bathrooms, and science room received their final touches and we're excited for students to start using them!
The new fitness room and main office are moving along well with the drywall installation wrapping up and the drywall finishing beginning. Soon the areas will be ready to receive their paint and ceilings. Aluminum framed window installation has also begun recently with the frames installed and the glass to arrive shortly.
In the addition the mechanical, electrical, and plumbing crews are hard at work installing their overhead systems and the roofers have begun to install the new roof. The exterior of the addition is also moving along with brick installation starting and the exterior framing ongoing.
 The canopy over the new main entrance has been installed and awaits the completed brick around the columns. |
 The exterior brick has begun on the addition. |
Past Work
- Addition Spray Applied Waterproofing
- Middle School Re-Roofing
- New Fitness Room Drywall
- North Street Concrete Curb and Sidewalk Replacement
Upcoming Work
- Addition Above Ceiling Rough Ins
- Addition Brick Install
- Addition Corridor Roofing
- Addition Window Installation
 The aluminum frames for the new fitness room have been installed and await the glass installation. |
 The exterior framing has been completed around the north vestibule and is now ready for spray foam. |
DID YOU KNOW?
After drywall is hung on the walls in a space, the next step is to apply drywall tape and "mud" or joint compound to the seams and imperfections. The tape and mud are used to join the two sheets of drywall together and create a strong, continuous and smooth surface and helps prevent the seams from cracking over time.
Questions?
Project Manager, Ryan Treichel / 414.323.0611 / rtreichel@findorff.com
Superintendent, Jeremy Rosenthal / 608.287.8083 / jrosenthal@findorff.com
Findorff BUILDING & BEYOND
Click Here to Open the September 5, 2025 Executive Summary pdf