The basketball hoops are hanging in the gym. Soon they will receive their padding to show the completed look.
What's Happening?
The gym addition has made great progress the last two weeks! This week we have seen the installation of the gym equipment including basketball hoops, divider curtain and wall pads. This install will wrap up just in time for the wood flooring to begin next week.
The rest of the addition has continued with finishes. The permanent light fixtures in the corridor and the restrooms have been installed and are now providing light for the work to come. The flooring in the addition corridor has also begun with the luxury vinyl tile on the south side of the building and will continue going in throughout the addition and Middle School.
On the exterior of the building, the metal panel has continued to push forward despite the cold and snow. The new corrugated panel has shown a glimpse of the finished look with the Rib Lake Maroon starting to show.
|

Metal panel installation has continued with the corrugated panel wrapping up
|

The luxury vinyl tile installation has begun in the south corridor
|
Past Work
- Restroom Plumbing Fixtures
- Gold Acoustical Gym Panels
- Bathroom Partition Installation
- Painting throughout Addition Spaces
Upcoming Work
- Exterior Metal Panel
- Office Area Touchups
- Gymnasium Wood Floor
- Concessions Stand Coiling Door
|

The new switchgear has been installed inside the boiler room after a successful shut down
|

he bathroom partitions have been installed in the addition restrooms
|
DID YOU KNOW?
Luxury vinyl tile (LVT) is the flooring type that will be used for the corridors throughout the Rib Lake. Although it has a similar appearance to wood flooring, LVT is waterproof. Due to this property, LVT is a popular choice in areas exposed to moisture like kitchens, bathrooms, basements, and busy school hallways.
Questions?
Project Manager, Ryan Treichel / 414.323.0611 / rtreichel@findorff.com
Superintendent, Jeremy Rosenthal / 608.287.8083 / jrosenthal@findorff.com
Findorff BUILDING & BEYOND
Download Executive Summary PDF >> HERE